By SSR EVTECH ·
Mumbai is different from the rest of Maharashtra: most of the city is supplied by BEST (island city), Adani Electricity (most suburbs) or Tata Power, not MSEDCL. Some eastern suburbs, such as Bhandup and Mulund, are on MSEDCL. Check the name on your electricity bill first.
Areas we cover in Mumbai
We handle home and society EV charger installations across Andheri, Bandra, Juhu, Santacruz, Khar, Powai, Goregaon, Malad, Kandivali, Borivali, Dahisar, Jogeshwari, Chembur, Ghatkopar, Vikhroli, Bhandup, Mulund, Kurla, Worli, Lower Parel, Dadar, Prabhadevi, Colaba, Wadala and Sion and nearby areas. Not on the list? Send your address on WhatsApp and we will confirm.
Who supplies electricity in Mumbai, and why it matters
Your bill decides the route. If it says MSEDCL (as in Bhandup and Mulund), we can file your Green Meter application today. If it says BEST, Adani Electricity or Tata Power, we install the charger on your existing connection now, and our EV meter service for those areas is coming soon.
What we do for EV owners in Mumbai
- Load check on your existing connection, so the charger does not trip your main breaker.
- Bolt.earth charger supply: 3.3 kW, 7.4 kW single-phase, or 11/22 kW three-phase. See the EV chargers.
- Installation and testing, with a measured cable run, the right breaker and earthing, before the charger is handed over.
- Society paperwork: we help you prepare the NOC request. See the housing society guide.
Homes, bungalows and housing societies in Mumbai
Bolt.earth charger supply and installation is available across Mumbai today. Green Meter (EV meter) applications are available for MSEDCL consumers, and our service for BEST, Adani Electricity and Tata Power areas is coming soon. Until then we can still install your charger on your existing connection and tell you whether your sanctioned load can carry it.
What it costs in Mumbai
The total is the charger, the cable from your meter to the parking spot (priced per metre), and, if you want one, the EV meter package. The cable length usually decides the price more than anything else. Get an itemised estimate in 30 seconds with the installation cost calculator, and see whether a separate meter saves you money with the EV meter savings calculator.
Frequently asked questions
Yes. SSR EVTECH supplies and installs Bolt.earth home and society chargers across Mumbai, including Andheri, Bandra, Juhu. Send your car model and address on WhatsApp for a quote.
If your bill is from MSEDCL (for example in Bhandup or Mulund), yes. For BEST, Adani Electricity and Tata Power consumers our EV meter service is coming soon; we can install your charger on your existing connection now.
The charger itself is installed and tested in a few hours once the cable route is ready. If you also need a Green Meter or a load upgrade, the MSEDCL process takes longer and depends mostly on how complete the documents are and how quickly a society NOC is issued.
Match it to your car's onboard charger and your supply. Most cars on sale today charge at 7.2 to 7.4 kW on a single-phase supply, so a 7.4 kW charger suits them. 11 kW needs a three-phase supply and a car that accepts 11 kW. See our charger guide by car.
