EV owners with a home charger
Independent houses and apartments. We check whether your sanctioned load is enough and file the upgrade if it isn't.
From 3.3 kW at home to 250 kW for charging businesses, we prepare the documents, file with MSEDCL, follow up and coordinate the meter installation. You don't queue at an office.
All of Maharashtra
MSEDCL EV meter and load upgrade applications, statewide
3.3 to 250 kW
load sanction range we support, from home to CPO
Independent houses and apartments. We check whether your sanctioned load is enough and file the upgrade if it isn't.
Shared parking with several chargers. We plan load, meter and paperwork together so installation isn't held up.
Public and commercial sites needing load sanction up to 250 kW for AC and DC fast chargers.
Six steps. You share documents once. We do the rest.
Send your latest electricity bill and your EV or charger. We assess your current load, tell you whether an upgrade is needed and set the right target load.
We give you a checklist and prepare the application set. We confirm the exact list for your case.
We file the Green Meter request and, where needed, the load upgrade with MSEDCL.
We track the application, respond to MSEDCL queries and coordinate inspection through to final commissioning.
Once sanctioned, we coordinate the meter installation and the wiring at your site.
We can supply and install a Bolt.earth charger in the same visit.
Approval timelines depend on MSEDCL and your site. We give you an estimate after the eligibility check.
| Use case | Typical charger | Load requested |
|---|---|---|
| 2W/3W or small home charger | 3.3 kW AC | From 3.3 kW |
| Home 4W EV | 7.4 kW AC | Confirmed after bill check |
| Faster home or society charging | 11 to 22 kW AC | Confirmed after bill check |
| Commercial or CPO site | DC 30 to 240 kW | Up to 250 kW |
Final load depends on your connection, supply type and charger. We confirm it before you spend on equipment.
MSEDCL confirms the exact list for each case. We tell you yours at the eligibility check.
Plain-language answers on EV meter applications, tariffs, load and societies.
All guides2026-10-11
A worked MSEDCL example: what charging costs on your home meter vs a separate EV meter, and when it pays back.
Read the guide2026-10-11
How to read your sanctioned load, what each charger size needs, and when a separate EV meter is the simpler route.
Read the guide2026-10-02
The process, documents, tariff benefits and the mistakes that stall applications.
Read the guideA dedicated meter for EV charging, usually on a separate EV tariff, so charging is measured apart from your household or business consumption.
It depends on your sanctioned load and the charger you choose. Share your latest bill and we will tell you before you buy anything.
Yes. Liaisoning is available on its own, for any charger and any EV.
Yes. We support load sanction from 3.3 kW up to 250 kW for commercial and public charging sites.
We handle EV meter applications for MSEDCL (Mahavitaran) consumers anywhere in Maharashtra. Adani Electricity, Tata Power and BEST areas are coming in the next few months.
Fill in a few details. We reply on WhatsApp with what you need and what it will take.