Skip to content
WhatsApp

MG Cyberster home charger: price, charging time and installation

Charger, installation and MSEDCL Green Meter from one team in Pune.

By SSR EVTECH ·

Our pick: Bolt.earth 7.4 kW at ₹24,999. The MG Cyberster takes up to 7.4 kW on AC. A Bolt.earth 7.4 kW single-phase wall charger runs it at its full AC speed on a normal home supply. A bigger 11 or 22 kW charger would not charge it any faster.

MG CybersterDetails
Battery77 kWh
Takes on ACUp to 7.4 kW
Charger we recommendBolt.earth 7.4 kW home charger (₹24,999)
Also from usInstallation and MSEDCL Green Meter

How long it takes to charge a Cyberster

Charger77 kWh
Portable charger on a 15 A socketabout 23 h
Bolt.earth 7.4 kW (single-phase)about 10.5 h
Bolt.earth 11 kW (three-phase) (car limit 7.4 kW)about 10.5 h
Bolt.earth 22 kW (three-phase) (car limit 7.4 kW)about 10.5 h

Approximate time from 10% to full. Our estimate: battery size divided by the charging power the car accepts, plus about 10% for losses. Real times vary with temperature, battery level and your supply.

At home you usually top up from 20 or 30% overnight, so the car is ready by morning.

MG supplies the Cyberster with a 3.3 kW portable charger and a 7.4 kW wall box (Mobility Outlook, checked October 2026). We install the wall box you already have, or supply a Bolt.earth 7.4 kW charger, and handle the Green Meter.

What we do for Cyberster owners

  • Charger: a Bolt.earth wall charger at list price, from an Authorized Bolt.earth Distributor Partner.
  • Installation: site check, cable from your meter to the parking, protection and fitting, tested before handover.
  • Green Meter: the MSEDCL (Mahavitaran) EV meter or load upgrade, with documents prepared and followed up until it is installed. How the Green Meter application works.

Most sellers do only one of these. With us you get one quote and one team to call.

Frequently asked questions

No. Any Type 2 AC charger works with the MG Cyberster. A Bolt.earth charger from us is installed and backed by the same team that handles your Green Meter.

On the Bolt.earth 7.4 kW charger, the 77 kWh pack takes about 10.5 h from 10% to full (our estimate). Real times vary with battery level, temperature and your supply.

It depends on the charger and the cable run from your meter to the parking. Our free EV Charger Installation Cost Calculator gives you an itemised estimate in 30 seconds.

Not always, but a separate MSEDCL EV meter (Green Meter) often costs less to run than charging on your home slabs, and it avoids a load upgrade on your home connection. Our Green Meter Savings Calculator shows the difference for your bill.

Other MG Motor EVs

Home chargers for every car · All Bolt.earth chargers and prices

Get a Cyberster charger quote

One quote for the charger, installation and Green Meter. We reply on WhatsApp or phone.

  • We reply on WhatsApp or phone
  • Clear quote before you commit
  • EV Meter for MSEDCL (Mahavitaran) consumers

Your details go to the SSR EVTECH sales team. We reply on WhatsApp or phone.