Skip to content
WhatsApp

EV charger installation and Green Meter in Hinjewadi

By SSR EVTECH ·

Hinjewadi's IT parks have pushed EV ownership up fast, and some newer townships in Phase 1, 2 and 3, Maan and Marunji were built with EV-ready parking. MSEDCL supplies the area, so a Green Meter application here follows the same MSEDCL process as the rest of Pune.

Areas we cover in Hinjewadi

We handle home and society EV charger installations across Hinjewadi Phase 1, Hinjewadi Phase 2, Hinjewadi Phase 3, Maan, Marunji, Hinjewadi Gaon, Mahalunge, Nere, Jambhe, Kasarsai, Pirangut and Sus and nearby areas. Not on the list? Send your address on WhatsApp and we will confirm.

Who supplies electricity in Hinjewadi, and why it matters

Electricity in Hinjewadi is supplied by MSEDCL (Mahavitaran, often still called MSEB). That means you can apply for a Green Meter, a separate EV connection billed on the EV charging tariff instead of your home slabs. SSR EVTECH prepares the documents, files the application with your local MSEDCL office and follows up until the meter is fitted.

What we do for EV owners in Hinjewadi

  • Green Meter (EV meter) application with MSEDCL, including a load upgrade if your sanctioned load is too low.
  • Bolt.earth charger supply: 3.3 kW, 7.4 kW single-phase, or 11/22 kW three-phase. See the EV chargers.
  • Installation and testing, with a measured cable run, the right breaker and earthing, before the charger is handed over.
  • Society paperwork: we help you prepare the NOC request. See the housing society guide.

Homes, bungalows and housing societies in Hinjewadi

Newer townships in Hinjewadi may already have a cable tray or a meter-room provision for EV charging, which shortens the job. Older buildings near Hinjewadi Gaon and Marunji may need a fresh cable route and a society NOC. We check both on the first visit.

What it costs in Hinjewadi

The total is the charger, the cable from your meter to the parking spot (priced per metre), and, if you want one, the EV meter package. The cable length usually decides the price more than anything else. Get an itemised estimate in 30 seconds with the installation cost calculator, and see whether a separate meter saves you money with the EV meter savings calculator.

Frequently asked questions

Yes. SSR EVTECH supplies and installs Bolt.earth home and society chargers across Hinjewadi, including Hinjewadi Phase 1, Hinjewadi Phase 2, Hinjewadi Phase 3. Send your car model and address on WhatsApp for a quote.

Yes. Hinjewadi is supplied by MSEDCL, so you can apply for a separate EV meter billed on the EV tariff. We prepare and file the application and follow up with MSEDCL.

The charger itself is installed and tested in a few hours once the cable route is ready. If you also need a Green Meter or a load upgrade, the MSEDCL process takes longer and depends mostly on how complete the documents are and how quickly a society NOC is issued.

Match it to your car's onboard charger and your supply. Most cars on sale today charge at 7.2 to 7.4 kW on a single-phase supply, so a 7.4 kW charger suits them. 11 kW needs a three-phase supply and a car that accepts 11 kW. See our charger guide by car.

Nearby areas

Get a quote in Hinjewadi

Share your car and address. We reply on WhatsApp with the right charger, meter plan and installation cost for Hinjewadi.

  • We reply on WhatsApp or phone
  • Clear quote before you commit
  • EV Meter for MSEDCL (Mahavitaran) consumers

Your details go to the SSR EVTECH sales team. We reply on WhatsApp or phone.